Discipline: Engineering

Comparative Life Cycle Assessment and Economic Analysis of Three Slurry Treatment Methods in Large-Scale Chicken Manure Biogas PlantComparative Life Cycle Assessment and Economic Analysis of Three Slurry Treatment Methods in Large-Scale Chicken Manure Biogas Plant

The sustainable management of biogas slurry is crucial not only to mitigate its environmental impact but also to avoid increasing the operational costs of large-scale biogas plants. Several methods are implemented in these plants to ensure that slurry is managed efficiently and sustainably. This study utlized Comparative Life Cycle Assessment LCA methodology to evaluates the […]

Use of sensors & actuators, and design of controllers for robotic/mechatronic systemsUse of sensors & actuators, and design of controllers for robotic/mechatronic systems

Assessment task and specific terms  This is a group assignment contributing 50% of the overall assessment of the module. Each group comprises two, three or – as an exception- four members. Coursework submitted before or on the “Sub” milestone mentioned in the Course Schedule is graded on the full 0-100 scale (maximum grade 100). Assignments […]

Solidworks: coursework – construction and implementation of a small-scale mechanismSolidworks: coursework – construction and implementation of a small-scale mechanism

 ndividual Technical report, Presentation and Demonstration of the final artifact. Each group should complete at least the following phases: a) Design phase: Design the selected mechanism using suitable CAD software (e.g. Solidworks). Create a 3D model of the mechanism and its component separately. Finally, create drawings with all the necessary information in order to manufacture […]

Basic principles and necessity of investment appraisal methods in modern renewable energy systemsBasic principles and necessity of investment appraisal methods in modern renewable energy systems

 Part A: Photovoltaic (PV) Energy Park (approximately 1500 words) Tasks  Produce the Work Break Down Structure (WBS) of a medium size PV Energy Park in Greece  Use Gannt Chart methodology to present detailed activities sequence according to above mentioned WBS  Estimate indicative costs per category of equipment and installation activity  […]